PRODUCT OPERATION & MAINTENANCE PROCEDURE
Model 0101
5
POP-0011– Rev. 5
5.
Once the "Red" Shipping Plug has been replaced with the "Black" Breather Plug, re-secure the Back
Panel by replacing the (6) Phillip Head Screws in the following sequence: Begin with the two bottom
screws, followed by the two top screws, and finally with the two middle screws. (NOTE: You may
need to squeeze the sides of the Top Cover to install the middle screws.) Again remember to retain the
"Red" Shipping Plug for future use when transporting the Crusher.
6.
With the Back Panel securely fastened, the Crusher can now be plugged into the appropriate electrical
outlet. The Crusher must be installed according to the Customer's incoming power:
115 volt units must be installed on a 110-120V/1/60Hz, grounded electrical line service. These
Crushers are equipped with a 15 Amp three-prong plug on the power cord.
230 volt units must be installed on a 220-240V/1/50Hz, grounded electrical line service. These
Crushers are equipped with a 10 Amp two-prong European plug on the power cord.
Note: 230 volt
plugs may vary depending on location.
Remove Back Panel by
un-screwing the six
Phillips Head Screws
Remove Shipping Plug (RED)
and replace with the Breather
Plug (BLACK) which is supplied
in the bag located in crushing
chamber.
Removed Back Panel –
Leaned against the side of
Crusher.
Back Panel