DOCS-010 Manual, SeaBotix Inc. Users, 200 Series – 18 Mar 09 - Rev B - Page 7 of 52
Section 1. Introduction
1.1 Unpacking System
Prior to removing the LBV and all components, locate a suitable area for operation. Find an
area that is comfortable, protected from harsh conditions and clear of potential hazards.
Requirements for operation:
Suitable power source
o
The LBV system employs a built-in GFI circuit. Do not connect to
an outlet with its own GFI circuit
o
Do not use an uninterruptible power supply (UPS)
Dry area
Contents of packaging:
LBV200L
LBV underwater vehicle
Integrated Control Console
Tether and reel
Spares/Tool Kit
Manual/CDROM
Accessories (if applicable)
CBA066 Reel-to-ICC video cable
Note:
When unpacking the LBV after receipt, inspect the LBV for damage. It is
strongly recommended that vacuum be verified before each use (see section
1.4.1).
URS250-FOV
LBV200
2
ICC