DOCS-010 Manual, SeaBotix Inc. Users, 200 Series – 18 Mar 09 - Rev B - Page 12 of 52
NOTE:
Make sure that there is no sign of water or debris in or on the connectors
prior to connecting.
1)
2)
3)
4)
1. AC
Power connector
5) 2. Video In
6) 3. Pull Out Hub whip connection
7) 4. Data (RS232 Connector)
5. Video out to additional device
1.4
Pre-Dive Inspection and System Test
Before placing the LBV in the water, it is important to ensure that all LBVs operate as they
are supposed to. This process should be done each time the LBV is operated and will only
take a moment to perform.
1.4.1
Inspection
1. Visually look the LBV over for obvious damage. Look at the condition of the view
port, seals, thrusters etc. for obvious damage
2. Check the tether for damage.
3. Check the thrusters for objects that may get or be caught in the propellers.
4. Check vacuum before every dive.
1
2
5
4
3