Date Code 20010731
Testing and Troubleshooting
11-23
SEL-352-1, -2 Instruction Manual
9. Repeat Steps 3, 4, 5, 6, and 7 (optional) for phases B and C.
10. For each test, the relay generated a sequential events record for the elements
programmed in Step 1. View the SER using the
SER
command. These time
stamps will also verify the FCpu setting. The FCpu timer is the time between the
assertion of TRIPA and assertion of FBF.
L
OAD
C
URRENT
B
REAKER
F
AILURE
, S
CHEME
1 L
OGIC
T
EST
Purpose: Verify operation of the Scheme 1 load current breaker failure logic (Reference:
Figure 3.17).
Method: 1. While the relay can use two different load current breaker failure schemes, only
one is enabled at a time. Select Scheme 1 by setting LDLOG = 1 in the relay
setting group. Using the
SET
command, set an output to close when the LBF
element asserts, and set the SER to trigger for the TRIPA, 50LD, LPF, and LBF
elements. Verify the settings with the
SHO
command, and verify the
SHO G
command for TRIPA.
Setting
Elements
LDLOG, 50LD,
LPpu, LFpu
TRIPA
50FT, FBF
2. Connect an external timer, and set it to start when the TRIPA input asserts and
stop when the programmable output you set in Step 1 asserts.
3. Apply A-phase current above the 50LD setting. (Current should not exceed the
50FT setting.)
4. Assert the TRIPA input. This starts the relay 62LP and 62LD timers. The
external timer should also start.
5. Shortly after TRIPA input assertion, the programmable output contact set in Step
1 should close, indicating LBF bit assertion. This action should stop the external
timer. Record the timer reading. It should be close to the LDpu setting.
6. Deassert the TRIPA input, and shut off A-phase current.
7. This step is optional. To test logic operation under conditions that could represent
normal relay/breaker operation, repeat Steps 3 and 4. This time, turn off A-phase
current 1.5 to 2.0 cycles before the 62LD timer expires. The LBF bit should not
assert.
8. Repeat Steps 3, 4, 5, 6, and 7 (optional) for phases B and C.
9. In Step 5, 62LP timer expiration can generate an event report. You can set the
LPF bit in a programmable output contact mask, and perform Steps 3, 4, 5, 6, and
7 to test the load current pending failure logic.
10. For each test, the relay generated a sequential events record for the elements
Summary of Contents for SEL-352-1
Page 8: ......
Page 10: ......
Page 12: ......
Page 30: ......
Page 68: ......
Page 186: ......
Page 292: ......
Page 302: ......
Page 368: ......
Page 370: ......
Page 374: ......
Page 380: ......
Page 382: ......
Page 384: ......
Page 386: ......
Page 396: ......
Page 404: ......
Page 422: ......
Page 442: ......