Operating manual for the VISATRON VN2020
V2.0 12/2021 EN
Page
76
of
106
SCHALLER AUTOMATION
66440 Blieskastel / Saarland / Germany / Industriering 14 / P.O. Box 1280
Industrielle Automationstechnik GmbH & Co. KG
T
el. +49(0)6842-508
-
0
/ Fax -260 / Email: [email protected] /
www.schaller-automation.com
15.
Figure 121: Installing the glands/plugs
16.
Figure 122: Insert the cable
Assemble the original glands/plugs
on the new terminal box. For torque
specifications, see start of
Section 10.1.2
Insert the cables through the cable
glands.
17.
Figure 123: Place the wires in position
18.
Figure 124: Tighten the cable glands
Fit the wires according to the wiring
diagram on the back of the cover
(see step 4).
Tighten the cable glands. Make sure that
the cable does not turn as you tighten
them.
19.
Figure 125: Fit the cover
20.
Figure 126: Switch on the power supply
Install the cover of the terminal box.
Tighten the four screws crosswise.
Switch the power supply of the oil mist
detector back on.