MC 5 (-0CE) and SC 2 (-0CE):
Assembling the Components
§
Place the components listed below on the
weighing cell
(35)
one at a time in the order given:
– Protective disk
(8)
– Weighing pan
(7)
Important Note:
After placing the weighing pan
on the weighing cell, press down on it gently while
turning it slightly to the left and right.
– Inner draft shield
(36)
(models SC 2 and
SC 2-0CE only)
Installing and Adjusting the Draft Shield
– Place the small draft shield
(34)
on the weighing cell
and adjust it so that the gap fits over the projection
on the weighing cell (see arrows).
Connecting the Weighing Cell
to the Computing Device
Connect these two units so that the two points
where the connecting cable is attached to the female
connectors face each other (see arrows).
Tighten the screws on the female connectors by hand.
1–12
Summary of Contents for MC 210 S
Page 4: ...General View of the Balances MC 210 S MC 210 P and MC 410 S 0CE 1 0...
Page 6: ...General View of the Balances MC 5 0CE and SC 2 0CE 1 2 34 35 36 10 7 9 8 37...
Page 46: ......
Page 78: ......
Page 160: ......
Page 166: ...5 6 Z 14 755 320 34 10 93...
Page 170: ......
Page 174: ...6 4...
Page 178: ......
Page 179: ......