ENGLISH-43
02
INST
ALL
ATION
Final checks and trial
o
perati
o
n
Inspecti
o
n bef
o
re test
o
perati
o
n
1. Check the power cable and communication cable of the indoor and outdoor unit.
2. Check the power supply between the outdoor unit and the cabinet panel.
- Check the 220-240
V~ / 380-415
V~ with the voltage meter.
3. Once the outdoor unit is turned on, it performs the tracking to check the connected indoor unit and options.
Test
o
perati
o
n
1.
Run the unit by KEY MODE
o
r c
o
ntr
o
ller.
- Inspect the compressor sound during the initial operation. If roaring sound is heard, stop operation.
2.
Check the ind
oo
r and
o
utd
oo
r units’ running status.
- Indoor and outdoor unit’s abnormal running noise.
- Proper drainage from indoor unit in cooling mode.
- Check detail running status using S-NET program.
3.
Finish test.
4.
Explain t
o
the cust
o
mer h
o
w t
o
use the Air t
o
Water Heat Pump f
o
ll
o
wing the user’s manual.