Operating the R&S
QAR
R&S
®
QAR
37
User Manual 1178.7200.02 ─ 09
For a detailed description of the features of the R&S
License Manager, refer to its inte-
grated help (available via the "?" icon) or the documentation available on Gloris.
5.1
Radome Measurements
For radome measurements, the R&S
QAR measures the characteristics of a DUT
using its full 12 clusters. The data evaluated from the data of 12 clusters provides an
image of the DUT with a high resolution. You can see the resulting image in the user
interface of the R&S
QAR software.
The typical procedure when measuring a radome (DUT) is as follows:
1. Start the R&S
QAR to start the system and the measurement application.
For more information about the functionality of the measurement application, see
Chapter 5.1.2, "Graphical User Interface"
2. Normalize the test setup.
For more information about the normalization, see
3. Measure the DUT.
For more information about the measurement and its results, see
4. Save and restore measurement data.
For more information about saving and restoring measurement data, see
5.1.1
Test Setup
Basic test setup
The basic test setup for radome measurements consists of the R&S
QAR and a DUT
that is placed at a certain distance from the R&S
QAR.
Radome Measurements