Preparing for Use
R&S
®
QAR
17
User Manual 1178.7200.02 ─ 09
4
Preparing for Use
Before you can use the R&S
QAR, install it and connect the devices as described in
the next subchapters.
........................................................................................17
...........................................................................................17
.......................................................................................31
....................................................................... 32
4.1
Unpacking the R&S
QAR
1. Remove the cardboard box carefully.
2. Remove the wooden supporting elements.
3. Lift the R&S
QAR off the pallet using the handles attached to the R&S
QAR.
Shipping the R&S
QAR
We recommend using the original packaging if the R&S QAR has to be shipped.
4.2
Installing the R&S
QAR
Using the R&S
QAR requires you to install it firmly to some kind of support fixture in
order to prevent it from toppling over. You can install the R&S
QAR in different ways,
depending on the equipment you have bought.
If you would like to use a fixture different to those described here, contact
Rohde
&
Schwarz.
Required tools
Here is a complete list of tools you need for installation on the platform and the installa-
tion of the DUT mounting table and the transmitter module.
●
Allen wrench size 5 (for screws ISO 10642 M8x20)
●
Allen wrench size 6 (for screws ISO 4762 M8x40)
●
Allen wrench size 10 (for screws ISO 4762 M12x55)
●
Torx wrench size TX20
●
Open-end wrench size 19
●
Spirit level
●
Torque wrench
●
Power drill (for floor installation only)
Installing the R&S
QAR