Preparing for Use
R&S
®
QAR
18
User Manual 1178.7200.02 ─ 09
●
Anchor bolts size 12 mm, for example a Fischer FAZ II 12 (for floor installation
only)
.......................................................................18
...................................... 20
Installing the Radome Measurement Elements
...................................................... 22
Installing the Bumper Measurement Elements
....................................................... 24
...................................... 30
4.2.1
Installing the R&S
QAR on the Floor
You can install the R&S
QAR on the floor or on the optional platform. When you do not
use the platform, the R&S
QAR must be attached to the floor.
Required tools:
●
Allen wrench size 5 (for screws ISO 10642 M8x20)
●
Allen wrench size 6 (for screws ISO 4762 M8x40)
●
Power drill
●
Anchor bolts size 12 mm, for example a Fischer FAZ II 12.
The anchor bolts and power drill are not part of the delivery.
If you have one of the the optional platforms, see:
●
Chapter 4.2.2, "Installing the R&S
●
Chapter 4.2.5, "Installing the R&S
1. Drill 4 holes into the ground.
The locations of the drill holes and distances between each other are indicated in
Figure 4-1: Location and distances of drill holes
Installing the R&S
QAR