1.
Disconnect the cable of the hand switch from the hand switch
interface HS.
2.
Connect the cable of the hand switch to the hand switch
interface HS.
ð
The hand switch with 6 function buttons is detected by
the control unit automatically and is ready for operation.
5.4.3 Connecting the safety edge provided by the operator
A safety edge provided by the operator can be connected to the
MultiControl II and is used to safeguard possible crushing and
shearing points.
If multiple control units are operated synchro-
nously, only use the safety shut-off function on the
master control unit.
Personnel:
n
Qualified electrician
Protective equipment:
n
Protective clothing
n
Safety shoes
Prerequisite:
n
The mains cable is disconnected from the voltage supply.
1.
Connect the BUS cable (Fig. 22/1) to the DATA interface on
the control unit.
2.
Connect the exposed wires of the BUS cable to the opera-
tor's safety edge between GND and sensor input 1 in accord-
ance with the following table:
Pin
Wire
colour
Function
1
Brown
-
4
Grey
Sensor input 1
3.
Activate the "safety edge" function
ð
The operator's safety edge has been connected and acti-
vated.
Connecting the hand switch with
6 function buttons
Safety edge
Connecting the safety edge
Fig. 22: Connecting the BUS cable
(control unit)
Activating the safety edge
Assembly
Connecting the accessories > Connecting the safety edge provided by the operator
20.08.2021
Control unit RK MultiControl II duo/RK MultiControl II quadro
154
Summary of Contents for RK MultiControl II duo
Page 115: ...Anhang Anhang 20 08 2021 Steuerung RK MultiControl II duo RK MultiControl II quadro 115...
Page 116: ...Anhang 20 08 2021 Steuerung RK MultiControl II duo RK MultiControl II quadro 116...
Page 228: ...Appendix Appendix 20 08 2021 Control unit RK MultiControl II duo RK MultiControl II quadro 228...