INSTALLATION
Installation Instructions for SIS Bus Bar Systems A2MS001EN revision R05
79 / 130
Preparing the seal
……………………….. Personnel:
Installation staff
Protective Equipment:
Occupational safety clothing
Protective gloves
Safety footwear
Fig. 82: Seal parts for the outdoor
connection sleeve
1.
Clean the bus bar element onto which the
components for installation are pushed.
2.
On both sides, push on a small hose clamp,
bellows, two large hose clamps and a pre-assembled
ring seal unit onto the bar (Fig. 82).
Fig. 82 and Fig. 83 show the left-hand side of the
outdoor connection sleeve. In this case, the nuts are
on the left and the earthing on the right so that the
earthing for the ring seal unit is subsequently situated
on the inside of the connection sleeve pipe and the
ring seal unit can be secured by tightening the nuts,
which compresses and expands the rubber of the ring
seal unit.
Fig. 83: Position of the ring seal unit
3.
Mark the final position of the ring seal unit on the
bar by marking half the length of the connection sleeve
from the middle of the connection (Fig. 83).
4.
Prepare the components on the other side in a
mirror image of the sequence.