INSTALLATION
Installation Instructions for SIS Bus Bar Systems A2MS001EN revision R05
69 / 130
Plated surfaces
…………………………..
Plated surfaces like silver-plated surfaces must not be
grinded. Use them as they are. Except for this,
connections using flexible connectors with plated
surfaces are installed like Cu-Cu connections as
described in chapter 4.7.1.2.2 on page 64.
Aluminium / Aluminium
.........………….
Al-Al connections are installed like Cu-Cu connections
as described in chapter 4.7.1.2.2 on page 64 except
that the Al connection surfaces must be grinded using
a steel brush instead of a grinding fleece.
4.7.1.2.4
TIGHTENING THE
TORQUING
Personnel:
Installation Staff
Protective Equipment:
Occupational Safety Clothing
Industrial Safety Helmet
Protective Gloves
Safety Footwear
Fig. 62: Tightening the bolted connections with torque
…
Tighten the bolted connections to the proper torque per
the table in Appendix B (Fig. 62).