S-SERIES PRIVATE USE SERVICE MANUAL
INSTALLATION
SEPTEMBER 2020
2 - 5
32DSW02.F _______________________________________________
1.
ROUTE AND CONNECT MAIN POWER CABLE
a. Fasten the supplied main circuit breaker within 10 - 12" of battery (this will minimize the length of exposed
cable).
b. Refer to
Figures 2-4
and
2-5
. Drill one 3/4" diameter hole through vehicle floor adjacent to base of hy-
draulic pump unit. Deburr hole and install grommet. If necessary, cut away any flooring material that is
within ¼” of hole.
c. From beneath vehicle, insert red power cable through grommet and up to top of pump unit. Strip ½” of
insulation from cable. Using a wire crimper tool (such as Ricon hammer tool, part of kit P/N 01243) crimp
a supplied ring terminal to end of cable.
CAUTION!
Be sure there is no interference with any parts
that could damage power cable or other wires.
FIGURE 2-5: POWER CABLE ACCESS HOLE
.75" dia