S-SERIES PRIVATE USE SERVICE MANUAL
INSTALLATION
SEPTEMBER 2020
2 - 6
32DSW02.F
d. Refer to
Figure 2-6
. Fasten ring terminal to side pump solenoid. Secure cable to pump assembly (wiring
harness, hydraulic hose, etc) with cable ties.
e. From beneath vehicle, run cable along vehicle frame to main circuit breaker. Secure cable with cable
clamps every 18".
f. Cut excess length from cable where it reaches circuit breaker. Strip ½” of insulation from cable.
g. Crimp a supplied terminal to end of cable and then connect to AUX terminal of circuit breaker.
h. Cut a 12” length of cable from the excess previously removed. Strip ½” of insulation from both ends and
crimp supplied terminals to cable.
i. Connect one end of 12" cable to BAT terminal of circuit breaker.
j. Connect other end of cable to positive terminal of vehicle battery.
SIDE PUMP
SOLENOID
4 AWG POWER CABLE:
#4 RING
SOLENOID
LONG CABLE CONNECTED BETWEEN
MAIN CIRCUIT BREAKER AND POSITIVE
TERMINAL OF SOLENOID
TERMINAL
TOP PUMP