
230
230
Belt Contact Mechanism 1
Transfer belt lift solenoid: Lifts and lowers the belt
z
Belt lifts 500 ms after the drum motor starts at the
beginning of the job
z
Belt lowers at the end of the copy job
Service manual, section 6.10.2
Describe the mechanism.
The belt lift timing (500 ms after drum start) is about the same time as the leading
edge of the first sheet passes the registration sensor.
The transfer belt must be released from the drum for the reasons given in the
service manual:
The next slide is a two-step animation. Use the page-up and page-down keys to
demonstrate the contact and release mechanism on-screen.
Summary of Contents for B246 SERIES
Page 2: ...2 2 Basic Information about the B246 Series...
Page 8: ...8 8 What Options Does the Machine Have...
Page 25: ...25 25 Overview This section tells you what units the class will install...
Page 37: ...37 37 Installation Copier...
Page 53: ...53 53 Installation Options...
Page 68: ...68 68 Installation Printer Scanner and Options Service manual section 1 24...
Page 69: ...69 69 Install the Options Use the procedures in the service manual section 1 24...
Page 70: ...70 70 Updating the Firmware...
Page 76: ...76 76 Simplified Display Here is an example of the simplified display...
Page 231: ...231 231 Belt Contact Mechanism 2...
Page 241: ...241 241 B246 SERIES TRAINING COPIER ENGINE FUSING Fusing will be described in this section...