6 - INSTALLATION AND ASSEMBLY OF BOILER
•
Insert the cable from the actuator in the duct on the left-hand panel of the boiler coating at the point of the actuator installation
hole.
•
This cable comes out from the rear bottom part of the boiler. Take the three red, white and black wires and connect them to the
terminal with reference to the colours of the other three wires already in place.
•
Remove modular support "c" from the back of the boiler (lift and slide out) (point 1 in the figure).
•
Take the feeder and screws out of the turbolator kit.
•
Fasten the feeder "d" on support "c" without forcing the screws (point 2 in the figure).
•
In the electrical wiring locate the sheath containing the four wires with terminals at the ends.