22
815
1950
MIN.300
MIN.1700
1063
MIN. 300
300
~
400
1000
652
MIN.600
1385
815
1950
MIN.300
MIN.1700
1105
MIN. 300
300
~
400
1000
652
MIN.600
1385
5 - POSITIONING
REQUIREMENTS FOR INSTALLATION OF THE PLANT - POSITIONING
The most important thing to do before installation of the LOGIKA boiler is to set aside a suitable area that meets the minimum requirements
for installation.
•
the minimum clearance in front of the product
for the purpose of cleaning, maintenance, etc. must be
1000 mm
;
•
the minimum permissible distance between the back of the product and a wall must be
400 mm
;
•
the minimum distance between the top of the product and the ceiling must be
600 mm
to ensure easy access to the heat exchanger
for the purpose of cleaning and maintenance (e.g. for removing ash);
•
the minimum clearance between the product and the wall (side) must be
300 mm
.
MINIMUM REQUIREMENTS FOR LOGIKA BOILER AND MANUAL TANK
MINIMUM REQUIREMENTS FOR LOGIKA BOILER AND REFILL TANK
Summary of Contents for LOGIKA 25-35 REFILL
Page 52: ...50 y x S v 7 INSTALLATION AND ASSEMBLY OFTANK ASSEMBLYOFSIDEPANEL MANUALTANK ...
Page 121: ......
Page 122: ......
Page 123: ......