30
A
C
g
h
6 - INSTALLATION AND ASSEMBLY OF BOILER
It is necessary to put the auger all the way into the structure of the boiler (see figure 1) in order to prevent the shaft of the auger from
coming out of the hole at the back. Next, secure the shaft by re-inserting the carrier "
g
" and the screw "
h
" which were removed before
the auger was inserted in the structure of the boiler.
Summary of Contents for LOGIKA 25-35 REFILL
Page 52: ...50 y x S v 7 INSTALLATION AND ASSEMBLY OFTANK ASSEMBLYOFSIDEPANEL MANUALTANK ...
Page 121: ......
Page 122: ......
Page 123: ......