54
P
n
m
o
7 - INSTALLATION AND ASSEMBLY OF TANK
g) electrical and hydraulic connection of the control panel to the tank
Manual tank
Locate the main instrument panel "
P"
with control panel "
n
" and pressure gauge "
m
" which is in the tank package, and proceed with
electrical and hydraulic installation.
Connect the cable of the control panel "
n
" to the printed circuit board pos. "
o
" and the capillary of the pressure gauge "
m
" to the hydraulic
kit.
Attention!
It is not possible to assemble the instrument panel "
P
" until the sides of the tank have been assembled. Put it down on the
ground for time being.
CENTRAL PANEL WITH CONTROL PANEL AND PRESSURE GAUGE (manual tank)
ELECTRICAL CONNECTION OF CONTROL PANEL (manual tank)
POSITION FOR ELECTRICAL CONNECTION OF CONTROL PANEL (manual
tank)
Summary of Contents for LOGIKA 25-35 REFILL
Page 52: ...50 y x S v 7 INSTALLATION AND ASSEMBLY OFTANK ASSEMBLYOFSIDEPANEL MANUALTANK ...
Page 121: ......
Page 122: ......
Page 123: ......