4 - UNPACKING
PREPARATION AND UNPACKING
The LOGIKA boiler is delivered inclusive of all if electrical and mechanical components and already tested at the factory:
Install the boiler in the area set aside for it, making sure it conforms to the requirements. The body of the boiler must only ever be carried
upright with a trolley. The product must always be moved with care. If possible, unwrap the boiler near the chosen place of installation.
The packaging materials are neither toxic nor harmful, and therefore no particular disposal measures are required.
After removing all the packaging, check that the boiler is complete and not damaged. If in doubt, contact the retailer.
PACKAGING OF THE LOGIKA 25/35 BOILER
The Logika boiler is delivered in three different packages (and with additional packages for accessories), depending on the model:
•
A
- structure of the boiler (1 pack)
•
B
- tank (1 pack)
•
C
- casing of the boiler/tank (1 pack)
Easyclean kit accessories (on request)
•
D
- automatic ash outlet (1 pack)
•
E
- automatic turbolator (1 pack)
The following documents are provided in the package:
•
Plant booklet
•
Instruction booklet
•
Annex G - Technical test report for thermal plant of less than 35 kW.
•
Warranty