SECTION 14: D
ISCHARGE
ACCESSORIES
63 of 154
14.2 Splash Plate Installation
The splash plate is designed to hang, s
u
pported by
s
u
spension rods (rods pro
v
ided by others) directly
belo
w
the bottom discharge opening of a horizontal
air handler. The center point of the splash plate m
u
st
be located at the center point of the discharge
opening and be positioned belo
w
the air handler
w
ithin the range of dimensions sho
w
belo
w
as E
(min) & E (max.). For model sizes 60-89, center
s
u
pport rods
w
ill be req
u
ired (see ill
u
stration belo
w
).
NOTE:
Be s
u
re to incl
u
de pro
v
isions in the str
u
ct
u
re
s
u
spending the discharge plate that
w
ill pre
v
ent
s
w
ay/mo
v
ement of the plate
w
hen the s
u
pply fan is in
operation.
To attach all of the hanger rods to the splash plate,
start by threading a flanged n
u
t onto each hanger
rod. Then, slip each hanger rod do
w
n thro
u
gh a hole
located in each corner of the splash plate. Next, feed
a flanged n
u
t onto the rod belo
w
the splash plate.
Adj
u
sting the n
u
ts
w
ill le
v
el the splash plate. Torq
u
e
hard
w
are after le
v
eling.
FIGURE 50: Dischar
g
e Plate
DISCHARGE PLATE
SUPPORT RODS
(BY OTHERS)
FAN SECTION
CENTER HOLES
ON 60 THRU 89
13
/
16
” HOLES
1¾” TYPICAL
4 CORNERS
2”
2”
TYPICAL
D
B
D
A
C
E
RIGHT SIDE VIEW
Model
A
B
C
D
E
(min.)
E
(max.)
Wei
g
ht
(lbs)
4024
42
54
3
-
25
38
80
4036
47
72
3
-
36
54
110
4040
55
75
3
-
42
64
130
4044
58
81
3
-
46
70
140
4049
61
88
3
-
50
75
160
4054
65
97
3
-
56
84
180
4060
70
106
3
53
64
96
230
4066
72
116
3
58
70
105
250
4073
72
124
3
62
75
112
260
40
8
0
82
140
4
70
88
132
330
40
8
9
82
140
4
70
88
132
330
Summary of Contents for 4044
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 73: ...SECTION15 VIBRATION ISOLATION 65 of 154 FIGURE 52 Curb Mounted Roof Curb Roof Curb...
Page 109: ...SECTION19 ELECTRICAL 101 of 154...
Page 110: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 102 of 154...
Page 111: ...SECTION19 ELECTRICAL 103 of 154...
Page 112: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 104 of 154...
Page 113: ...SECTION19 ELECTRICAL 105 of 154...
Page 114: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 106 of 154...
Page 115: ...SECTION19 ELECTRICAL 107 of 154...
Page 116: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 108 of 154...
Page 117: ...SECTION19 ELECTRICAL 109 of 154...
Page 118: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 110 of 154...
Page 119: ...SECTION19 ELECTRICAL 111 of 154...
Page 121: ...SECTION 20 DIRECT FIRED BURNER 113 of 154 FIGURE 71 Midco HMA 2A Burner...
Page 122: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 114 of 154...
Page 125: ...SECTION 20 DIRECT FIRED BURNER 117 of 154...
Page 126: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 118 of 154...
Page 127: ...SECTION 20 DIRECT FIRED BURNER 119 of 154 20 3 Honeywell UV Flame Detector...
Page 160: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 152 of 154...
Page 161: ...SECTION 27 THE RAPID 4000 SERIES WARRANTY 153 of 154...
Page 162: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 154 of 154...