G. Operational Checks- Fan Operation
__ Fan rotation is correct. (See rotation sticker in the
u
nit.)
__ Check and record the follo
w
ing:
Volts (Fan Off) Phase 1-2 ___ Phase 2-3 ___ Phase 1-3 ___
Volts (Fan On) Phase 1-2 ___ Phase 2-3 ___ Phase 1-3 ___
R
u
nning Amps Phase 1 ___ Phase 2 ___ Phase 3 ___
Differential press
u
re drop across b
u
rner. (Meas
u
red at AFS t
u
bing test ports.) 20% OA ___ 100% OA ___
H. Operational Checks- Burner Operation
Inlet Standing Gas Press
u
re (in.
w
.c.) _____________________________________________________
___ Pilot is approximately the size of a baseball.
Pilot Line Press
u
re (in.
w
.c.) _____________________________________________________________
Flame Signal Relay (VDC) ______________________________________________________________
___ Lo
w
re gas press
u
re prod
u
ces a minim
u
m contin
u
o
u
s ribbon of flame.
B
u
rner High Fire Gas Press
u
re (in.
w
.c.) ___________________________________________________
Forced High Fire Inlet Gas Press
u
re (in.
w
.c.) _______________________________________________
Forced High Fire Mod. Gas Val
v
e Volts (VDC) _______________________________________________
High Fire B
u
rner Flame Length (in.) _______________________________________________________
Flame Color _________________________________________________________________________
___ Lo
w
airflo
w
s
w
itch opens on press
u
re drop. (Setpoint at .2"
w
.c.)
___ High airflo
w
s
w
itch opens on press
u
re rise. (Setpoint at 1.35"
w
.c.)
___ High temperat
u
re limit s
w
itch opens on temperat
u
re rise.
___ Lo
w
gas press
u
re limit s
w
itch opens on press
u
re fall.
___ High gas press
u
re limit s
w
itch opens on press
u
re rise.
___ Manifold gas leak test.
___ B
u
rner responds properly to room temperat
u
re setpoint changes.
Summary of Contents for 4044
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 73: ...SECTION15 VIBRATION ISOLATION 65 of 154 FIGURE 52 Curb Mounted Roof Curb Roof Curb...
Page 109: ...SECTION19 ELECTRICAL 101 of 154...
Page 110: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 102 of 154...
Page 111: ...SECTION19 ELECTRICAL 103 of 154...
Page 112: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 104 of 154...
Page 113: ...SECTION19 ELECTRICAL 105 of 154...
Page 114: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 106 of 154...
Page 115: ...SECTION19 ELECTRICAL 107 of 154...
Page 116: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 108 of 154...
Page 117: ...SECTION19 ELECTRICAL 109 of 154...
Page 118: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 110 of 154...
Page 119: ...SECTION19 ELECTRICAL 111 of 154...
Page 121: ...SECTION 20 DIRECT FIRED BURNER 113 of 154 FIGURE 71 Midco HMA 2A Burner...
Page 122: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 114 of 154...
Page 125: ...SECTION 20 DIRECT FIRED BURNER 117 of 154...
Page 126: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 118 of 154...
Page 127: ...SECTION 20 DIRECT FIRED BURNER 119 of 154 20 3 Honeywell UV Flame Detector...
Page 160: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 152 of 154...
Page 161: ...SECTION 27 THE RAPID 4000 SERIES WARRANTY 153 of 154...
Page 162: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 154 of 154...