4000-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
70 of 154
SECTION 1
8
: GAS PIPING
1
8
.1 Gas Manifolds
All gas piping to the air handler m
u
st comply
w
ith:
United States: Refer to NFPA 54/ANSI Z223.1 - latest
re
v
ision, National F
u
el Gas Code.
Canada: Refer to CSA B149.1 - latest re
v
ision,
Nat
u
ral Gas and Propane Installation Code.
The air handlers are a
v
ailable
w
ith three gas manifold
options.
• American National Standards Instit
u
te (ANSI)
compliant manifold: (
See Page 71, Figure 55
).
• Factory M
u
t
u
al (FM)-compliant manifold:
(
See Page 72, Figure 56
).
• XL Ins
u
rance (former IRI)-compliant manifold:
(
See Page 73, Figure 57
).
1
8
.2 Gas Pipin
g
and Pressures
The air handler is eq
u
ipped
w
ith a gas manifold
s
u
itable for connection to s
u
pply press
u
re of
u
p to 5
p.s.i. maxim
u
m for all manifold types.
When gas s
u
pply exceeds the abo
v
e-listed maxim
u
m
gas press
u
res, an additional high press
u
re gas
reg
u
lator
w
ill be req
u
ired to ass
u
re that the correct
gas press
u
re is s
u
pplied to the air handler.
O
u
tlet press
u
re from the reg
u
lator / inlet press
u
re to
air handler sho
u
ld be meas
u
red at the inlet of the air
handler gas manifold.
Minim
u
m gas press
u
re as indicated on data plate
m
u
st be meas
u
red
w
ith the b
u
rner operating in high
fire.
Minim
u
m inlet gas press
u
re is determined by gas
train size and BTU/h rating.
WARNING
Explosion Hazard
Leak test all components of gas piping
before operation.
Gas can leak if piping is not installed
properly.
Do not high pressure test gas piping with air
handler connected.
Failure to follow these instructions can result
in death, injury or property damage.
Summary of Contents for 4044
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 73: ...SECTION15 VIBRATION ISOLATION 65 of 154 FIGURE 52 Curb Mounted Roof Curb Roof Curb...
Page 109: ...SECTION19 ELECTRICAL 101 of 154...
Page 110: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 102 of 154...
Page 111: ...SECTION19 ELECTRICAL 103 of 154...
Page 112: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 104 of 154...
Page 113: ...SECTION19 ELECTRICAL 105 of 154...
Page 114: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 106 of 154...
Page 115: ...SECTION19 ELECTRICAL 107 of 154...
Page 116: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 108 of 154...
Page 117: ...SECTION19 ELECTRICAL 109 of 154...
Page 118: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 110 of 154...
Page 119: ...SECTION19 ELECTRICAL 111 of 154...
Page 121: ...SECTION 20 DIRECT FIRED BURNER 113 of 154 FIGURE 71 Midco HMA 2A Burner...
Page 122: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 114 of 154...
Page 125: ...SECTION 20 DIRECT FIRED BURNER 117 of 154...
Page 126: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 118 of 154...
Page 127: ...SECTION 20 DIRECT FIRED BURNER 119 of 154 20 3 Honeywell UV Flame Detector...
Page 160: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 152 of 154...
Page 161: ...SECTION 27 THE RAPID 4000 SERIES WARRANTY 153 of 154...
Page 162: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 154 of 154...