4000-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
148 of 154
SECTION 26: RAPID
®
4000-SERIES START-UP PROCEDURES: EVAPORATIVE COOLER
C
u
stomer: ________________________________
Technician: _______________________________
Start-Up Co: ______________________________
Date: ____________________________________
Model N
u
mber: ____________________________
Serial N
u
mber: ____________________________
Field start-
u
p sho
u
ld be performed by a q
u
alified technician. The technician is responsible for ass
u
ring that
all of the items on this checklist are properly installed and operating. Upon completion, a copy of this form
sho
u
ld be ret
u
rned to Rapid Engineering LLC
u
sing the contact information listed in the header
A. Pipin
g
___ Water s
u
pply piped to proper location on e
v
aporati
v
e cooler.
___ Water s
u
pply line drain solenoid (normally open) installed and piped to a drain inside the b
u
ilding.
___ Fill
v
al
v
e solenoid (normally closed) installed in the
w
ater s
u
pply line inside the b
u
ilding.
___ S
u
mp o
v
ero
w
is piped to a drain.
___ S
u
mp drain is piped and the s
u
mp drain
v
al
v
e is installed.
___ Trap installed in s
u
mp drain pipe per local code.
___ S
u
mp drain ball
v
al
v
e is
w
ired properly.
B. Electrical
___ Electrical connections are made at j
u
nction box on air handler.
___ Water s
u
pply line drain solenoid (normally open) is
w
ired properly.
___ Fill
v
al
v
e solenoid (normally closed) is
w
ired properly.
C. Basic Operation (Control Packa
g
e #1- Items apply to all evaporative coolers.)
___ E
v
ap enable relay (located in main electrical panel) energizes e
v
aporati
v
e cooler. The fill
v
al
v
e energizes
and s
u
mp begins filling.
___ The o
u
tside air freeze stat is set at 45° F.
___ When the o
u
tside air is belo
w
the freeze stat setpoint, the stat opens and the s
u
mp drains.
___ The
w
ater le
v
el is belo
w
the cardboard media s
u
pport. The media sho
u
ld ne
v
er sit in the
w
ater.
Adj
u
stment of the float may be req
u
ired depending on ho
w
le
v
el the air handler
w
as installed.
___ Flo
w
of
w
ater o
v
er the media is adj
u
sted properly. Proper o
w
is achie
v
ed by adj
u
sting (if needed) the
w
ater flo
w
adj
u
stment
v
al
v
e so that the media completely sat
u
rates
w
itho
u
t getting droplets of
w
ater
projecting o media in direction of airflo
w
. It may take
u
p to 2 ho
u
rs for the media to properly sat
u
rate.
Final o
w
adj
u
stments sho
u
ld be made then.
___ Adj
u
sted bleed-o rate to approximately 20% of the e
v
aporation rate. Please refer to the E
v
aporati
v
e
Cooler Maintenance Section of the Installation, Operation and Ser
v
ice Man
u
al for f
u
rther information.
WARNING
Falling Hazard
Use proper safety equipment and practices
to avoid falling.
Do not use any part of equipment as support.
Failure to follow these instructions can result
in death, injury or property damage.
DANGER
Electrical Shock Hazard
Disconnect electric before service.
More than one disconnect switch may be
required to disconnect electric from
equipment
Equipment must be properly grounded.
Failure to follow these instructions can
result in death or electrical shock.
WARNING
Cut/Pinch Hazard
Wear protective gear during installation,
operation and service.
Edges are sharp.
Failure to follow these instructions can result
in injury.
Summary of Contents for 4044
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 73: ...SECTION15 VIBRATION ISOLATION 65 of 154 FIGURE 52 Curb Mounted Roof Curb Roof Curb...
Page 109: ...SECTION19 ELECTRICAL 101 of 154...
Page 110: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 102 of 154...
Page 111: ...SECTION19 ELECTRICAL 103 of 154...
Page 112: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 104 of 154...
Page 113: ...SECTION19 ELECTRICAL 105 of 154...
Page 114: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 106 of 154...
Page 115: ...SECTION19 ELECTRICAL 107 of 154...
Page 116: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 108 of 154...
Page 117: ...SECTION19 ELECTRICAL 109 of 154...
Page 118: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 110 of 154...
Page 119: ...SECTION19 ELECTRICAL 111 of 154...
Page 121: ...SECTION 20 DIRECT FIRED BURNER 113 of 154 FIGURE 71 Midco HMA 2A Burner...
Page 122: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 114 of 154...
Page 125: ...SECTION 20 DIRECT FIRED BURNER 117 of 154...
Page 126: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 118 of 154...
Page 127: ...SECTION 20 DIRECT FIRED BURNER 119 of 154 20 3 Honeywell UV Flame Detector...
Page 160: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 152 of 154...
Page 161: ...SECTION 27 THE RAPID 4000 SERIES WARRANTY 153 of 154...
Page 162: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 154 of 154...