SECTION 20: D
IRECT
F
IRED
B
URNER
115 of 154
20.1 Direct Fired Burner I
g
nition
The b
u
rner that is
u
sed in the Rapid Engineering
LLC
u
nit is eq
u
ipped
w
ith a pilot assembly. The pilot
assembly consists of a pilot gas t
u
be, spark
electrode or rod and a flame rod
w
ith gro
u
nding
assembly. For proper ignition the spark rod m
u
st be
adj
u
sted correctly. A high
v
oltage arc is generated
bet
w
een the spark rod and the pilot gas t
u
be. The
gas flo
w
ing o
u
t the ports in the pilot gas t
u
be is
ignited by this arc. The arc
w
ill be a brilliant electric
bl
u
e in color.
See Page 115, Figure 72
.
FIGURE 72: Spark Rod Dimensions
The gas s
u
pplied to the pilot gas t
u
be sho
u
ld be 3 1/
2"
w
c for nat
u
ral gas and bet
w
een 9 to 11"
w
c for
propane or LP. The difference bet
w
een the t
w
o f
u
els
is that a restricting orifice is installed in the propane
or LP pilot gas t
u
be. The pilot assembly can be
u
sed
on propane or LP
w
itho
u
t an orifice, if this is the case
then the press
u
re for LP is 2.0"
w
.c. Ignition
w
ill take
place
w
ith the introd
u
ction of gas to the pilot gas
t
u
be. The pilot flame
w
ill be mostly bl
u
e in color
w
ith
streaks of yello
w
. The flame size
w
ill be ro
u
ghly 2" in
diameter. The flame m
u
st be steady and consistent
in size.
B
C
E
D
A
WARNING:
the ignition system on the air handler generates bet
w
een 6,000 to 10,000
v
olts.
A
B
C
D
E
in
2.940
0.125
0.125
1.881
0.633
cm
7.468
0.318
0.318
4.778
1.608
Summary of Contents for 4044
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 73: ...SECTION15 VIBRATION ISOLATION 65 of 154 FIGURE 52 Curb Mounted Roof Curb Roof Curb...
Page 109: ...SECTION19 ELECTRICAL 101 of 154...
Page 110: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 102 of 154...
Page 111: ...SECTION19 ELECTRICAL 103 of 154...
Page 112: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 104 of 154...
Page 113: ...SECTION19 ELECTRICAL 105 of 154...
Page 114: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 106 of 154...
Page 115: ...SECTION19 ELECTRICAL 107 of 154...
Page 116: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 108 of 154...
Page 117: ...SECTION19 ELECTRICAL 109 of 154...
Page 118: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 110 of 154...
Page 119: ...SECTION19 ELECTRICAL 111 of 154...
Page 121: ...SECTION 20 DIRECT FIRED BURNER 113 of 154 FIGURE 71 Midco HMA 2A Burner...
Page 122: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 114 of 154...
Page 125: ...SECTION 20 DIRECT FIRED BURNER 117 of 154...
Page 126: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 118 of 154...
Page 127: ...SECTION 20 DIRECT FIRED BURNER 119 of 154 20 3 Honeywell UV Flame Detector...
Page 160: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 152 of 154...
Page 161: ...SECTION 27 THE RAPID 4000 SERIES WARRANTY 153 of 154...
Page 162: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 154 of 154...