R&S FSH
Two-port measurements with the tracking generator
1145.5973.12 4.103
E-14
Calibration:
Before the R&S FSH is calibrated, the desired center frequency and span must be set. If they are set
later, the calibration values are lost and the calibration must be repeated.
Press the REFLECT CAL softkey.
The R&S
FSH displays a message requesting
termination of the measurement input into an open
circuit (Open).
Terminate the measurement input of the VSWR
bridge or the end of the measurement cable into
an open circuit.
Start open-circuit calibration by pressing the first or
the second softkey (CONTINUE). During
calibration, the R&S FSH outputs the message
"Calibrating OPEN, please wait...".
Calibration can be aborted at any stage with the
CANCEL softkey.
When the open-circuit calibration is over, the
R&S
FSH outputs a message requesting the
termination of the measurement port into a short
circuit.
Terminate the measurement input of the bridge or
the end of the measurement cable into a short
circuit.
Start the short-circuit calibration by pressing the
first or the second softkey (CONTINUE). During
calibration, the R&S FSH outputs the message
"Calibrating SHORT, please wait...".
In the third step of calibration, terminate the
measurement port into a 50 termination.
Terminate the measurement input of the bridge or
the end of the measurement cable into a
50 termination.
Start termination calibration by pressing the first or
the second softkey (CONTINUE). During
calibration, the R&S FSH outputs the message
"Calibrating LOAD, please wait...".
深圳市盛腾仪器仪表有限公司
Tel:0755-83589391
Fax:0755-83539691
Website: www.Sengt.com