Chapter 4: F2000 Customer Replaceable Units (CRUs)
Chassis Replacement
90
Quantum F2000 User’s Guide
f
Rotate the latch handles into the chassis until the are fully
engaged (see
).
Figure 81 Latching the
Canister (Bottom Canister
Example)
g
Repeat
to remove the other
canister from the failed chassis and install it into the new
chassis.