Chapter 4: F2000 Customer Replaceable Units (CRUs)
Rack Rails Replacement
166
Quantum F2000 User’s Guide
3
If the system contains 32 Gb FC cards, connect the FC cables to the
FC ports in PCIe slot 1 and PCIe slot 3 on the top canister and the
bottom canister (see
4
Connect the short CAT6A Ethernet cable that connects Port 4 on the
top canister to port 4 on the bottom canister (see
).
Figure 178 Port 4 Canister-to-
Canister Connection
Note:
Verify that the short CAT6A Ethernet cable that connects Port 4
on the top canister to port 4 on the bottom canister is securely
). This cable connection must be in
place before applying power to the system.
5
Connect one power cable to PSU A and the other cable to PSU B (see
Item
Description
1
Bottom canister PCIe slot locations
2
Top canister PCIe slot locations
Item
Description
1
Port 4 on the bottom canister
2
Port 4 on the top canister