SETUP & OPERATION
25
6.
Remove enough labels to expose 29 to 30
inches of backing material. Then place the
stack on the Label Tray. Adjusts the Side
guide [4] so that it is within 1/16” of the
labels.
7.
Thread the labels over the top of the Tray
and then down through the two guide rods
[5] as shown. Hook the Label Plate [6] over
the top guide and behind the lower guide, but
in front of the labels.
8.
Then continue threading of the labels in the
machine per the “Loading Tabs” instructions.
9.
To program the job, refer to the
“Programming the Job” instructions in this
manual.
Tip:
When running labels, it is recommended that you run the Tabber speed at 10,000 pieces per
hour or less.
Summary of Contents for rena T-950
Page 1: ...TABBER Labeler Stamp Affixer User Guide T 950 XPS ProTab 4 0 ...
Page 2: ......
Page 60: ...SETUP OPERATION 60 ...
Page 80: ...80 ...
Page 81: ......
Page 82: ... Quadient May 26 2020 ...