ASSEMBLY AND INSTALLATION
17
Choosing a Location
Protect the Tabber from excessive heat, dust, and moisture – avoid placing it in direct
sunlight.
XPS-ProTab 4.0:
Place the Tabber onto a sturdy floor surface, at least 12 inches from any
walls. Allow enough room to properly position the optional feeder/printer/conveyor around
the Tabber. The XPS-ProTab 4.0 is equipped with adjustable legs that can be used to
stabilize, level, and adjust the Tabber to the desired height. Even if you don’t plan to raise the
Tabber, please be sure to lower the adjustable legs, until they make strong contact with the
floor surface. This will help stabilize the Tabber.
T-950:
Place the Tabber and optional feeder onto a sturdy work-table or cabinet at least 12
inches from any walls. Allow enough room to place the feeder on the same work surface.
Feeder Stand Selection
Place the optional EasyFeed 120/140 feeder onto the appropriate Stand.
•
If the EasyFeed 120/140 Feeder is being used with the T-950 the Feeder should be placed
onto its Riser Stand and positioned at the entrance end of the Tabber.
NOTE: When using mail pieces that are shorter than 7” in length, you may need to
fabricate your own riser stand for the EasyFeed 120/140 feeder.
•
If the EasyFeed 120/140 feeder is being used with the XPS-ProTab 4.0 then the feeder
should be placed onto the XPS-ProStand and the stand must be adjusted for the
appropriate height.
Part #
Description
RS-500
Riser Stand for EasyFeed 120 when used with the T-950.
RS-140
Riser Stand for EasyFeed 140 when used with the T-950.
Summary of Contents for rena T-950
Page 1: ...TABBER Labeler Stamp Affixer User Guide T 950 XPS ProTab 4 0 ...
Page 2: ......
Page 60: ...SETUP OPERATION 60 ...
Page 80: ...80 ...
Page 81: ......
Page 82: ... Quadient May 26 2020 ...