
SECTION 3
Pronar T743
3.7
FIGURE 3.5
Load box design
(1) auger conveyor IX (rear), (2) auger conveyor X (left front), (3) auger conveyor XI (right
front), (4) auger conveyor VIII (collecting), (5) auger intake control roof, (6) channel slide
cover, (7) bearing connector
On the front wall of the load box (inside container) all their intake control roof is bolted to
brace (5) – figure (3.5). By changing the height of the roof one regulates the speed of grain
flow to the collecting auger conveyor (4), placed in the lowest part of the container (beneath
roof). Remaining 4 auger conveyors are placed in two parallel channels of load box. Rear
auger conveyors (1) bearings are in rear chain gearing and bearing connectors (7) in central
part of load box. Auger conveyor (3), receiving torque from gearing shaft (placed on front wall
of load box) is connected to augur conveyor (1) from right side of trailer.
Summary of Contents for T743
Page 2: ......
Page 6: ......
Page 11: ......
Page 12: ...SECTION 1 BASIC INFORMATION ...
Page 25: ...Pronar T743 SECTION 1 1 14 ...
Page 26: ...SECTION 2 SAFETY ADVICE ...
Page 46: ...SECTION 2 Pronar T743 2 21 FIGURE 2 3 Locations of information and warning decals ...
Page 47: ...Pronar T743 SECTION 2 2 22 ...
Page 48: ...SECTION 3 DESIGN AND OPERATION ...
Page 80: ...SECTION 4 CORRECT USE ...
Page 99: ...Pronar T743 SECTION 4 4 20 ...
Page 100: ...SECTION 5 MAINTENANCE ...
Page 119: ...Pronar T743 SECTION 5 5 20 FIGURE 5 6 Trailer lubrication points chassis ...
Page 120: ...SECTION 5 Pronar T743 5 21 FIGURE 5 7 Trailer lubrication points vertical conveyor ...
Page 147: ...Pronar T743 SECTION 5 5 48 ...
Page 148: ...NOTES ...
Page 149: ... ...