
5.2.16
OPERATION NO. 16 – INSPECTION OF TIGHTNESS OF FRONT CHAIN
TRANSMISSION (II STAGE)
5.27
5.2.17
OPERATION NO.17 – INSPECTION OF TIGHTNESS OF REAR CHAIN
TRANSMISSION
5.29
5.2.18
OPERATION NO. 18 – CHANGE OIL IN FRONT GEAR WHEEL
TRANSMISSION
5.30
5.2.19
OPERATION NO. 19 – CHANGE OIL IN CONVEYOR INTERSECTING
AXIS GEARING
5.31
5.3
UNLOADING SPEED ADJUSTMENT
5.32
5.3.1
ROOF HEIGHT ADJUSTMENT
5.33
5.3.2
ADJUSTMENT OF CHANNEL SLIDES IN GRAIN TANK
5.34
5.4
CONSUMABLES
5.36
5.4.1
HYDRAULIC OIL
5.36
5.4.2
GREASES
5.37
5.5
HYDRAULIC CLUTCH OPERATION
5.37
5.5.1
SAFETY ADVICE FOR HYDRAULIC CLUTCH CLEANING AND
MAINTENANCE
5.37
5.5.2
MOUNTING, MAINTENANCE AND CARE ADVICE
5.37
5.5.3
TIGHTENING TORQUE FOR NUT AND BOLT CONNECTIONS
5.38
5.5.4
SERVICE INSPECTION PERIODS
5.38
5.6
THOROUGH LOAD TANK CLEANING
5.38
5.7
TRAILER CLEANING
5.39
5.8
STORAGE
5.41
5.9
TIGHTENING TORQUE FOR NUT AND BOLT CONNECTIONS
5.41
5.10
LIST OF BULBS
5.43
5.11
EMERGENCY RELEASE OF DIAPHRAGM ACTUATOR
5.43
5.12
TROUBLESHOOTING
5.45
Summary of Contents for T743
Page 2: ......
Page 6: ......
Page 11: ......
Page 12: ...SECTION 1 BASIC INFORMATION ...
Page 25: ...Pronar T743 SECTION 1 1 14 ...
Page 26: ...SECTION 2 SAFETY ADVICE ...
Page 46: ...SECTION 2 Pronar T743 2 21 FIGURE 2 3 Locations of information and warning decals ...
Page 47: ...Pronar T743 SECTION 2 2 22 ...
Page 48: ...SECTION 3 DESIGN AND OPERATION ...
Page 80: ...SECTION 4 CORRECT USE ...
Page 99: ...Pronar T743 SECTION 4 4 20 ...
Page 100: ...SECTION 5 MAINTENANCE ...
Page 119: ...Pronar T743 SECTION 5 5 20 FIGURE 5 6 Trailer lubrication points chassis ...
Page 120: ...SECTION 5 Pronar T743 5 21 FIGURE 5 7 Trailer lubrication points vertical conveyor ...
Page 147: ...Pronar T743 SECTION 5 5 48 ...
Page 148: ...NOTES ...
Page 149: ... ...