Pronar T743
SECTION 5
5.18
ITEM
LUBRICATION POINT
N
U
M
B
E
R
O
F
L
U
B
R
IC
A
T
IO
N
P
O
IN
T
S
T
Y
P
E
O
F
G
R
E
A
S
E
F
R
E
Q
U
E
N
C
Y
15
Lock sleeve
1
A
3M
16
Bolting ram securing pin
2
D
3M
17
Self-centering bearing
1
A
1M
18
Two conduit cone gearing
(2)
1
E
500H
19
Upper conveyor bearing group
1
A
10H
20
Cylinder bolt and pin
5
D
3M
21
Hinge pin
4
A
3M
22
Gear wheel transmission
1
E
500H
23
Shaft elbows
6
24
Drive chains
3
F
10H
25
Bearing assembly
8
A
10H
(1)
comply with the instructions of shafts manufacturer, lubrication periods – M month, D – day, H man-
hour,
(2)
the first oil change should be carried out after 50 hours work,
A - permanent machine general-purpose grease
B - permanent grease for heavily loaded elements with addition of MOS
2
or graphite
C – anticorrosion preparation in aerosol
D – ordinary machine oil
E – SAE 90 EP gear oil
Summary of Contents for T743
Page 2: ......
Page 6: ......
Page 11: ......
Page 12: ...SECTION 1 BASIC INFORMATION ...
Page 25: ...Pronar T743 SECTION 1 1 14 ...
Page 26: ...SECTION 2 SAFETY ADVICE ...
Page 46: ...SECTION 2 Pronar T743 2 21 FIGURE 2 3 Locations of information and warning decals ...
Page 47: ...Pronar T743 SECTION 2 2 22 ...
Page 48: ...SECTION 3 DESIGN AND OPERATION ...
Page 80: ...SECTION 4 CORRECT USE ...
Page 99: ...Pronar T743 SECTION 4 4 20 ...
Page 100: ...SECTION 5 MAINTENANCE ...
Page 119: ...Pronar T743 SECTION 5 5 20 FIGURE 5 6 Trailer lubrication points chassis ...
Page 120: ...SECTION 5 Pronar T743 5 21 FIGURE 5 7 Trailer lubrication points vertical conveyor ...
Page 147: ...Pronar T743 SECTION 5 5 48 ...
Page 148: ...NOTES ...
Page 149: ... ...