
SECTION 5
Pronar T743
5.3
FREQUENCY
OPERATION
NUMBER
DESCRIPTION
A
B
C
D
E
F
G
8
Cleaning the air filters
•
9
Checking hydraulic system tightness
•
•
10
checking lighting and signalling system
•
•
11
Checking nut and bolt tightness on wheels
and drawbar
See 5.2.12
12
Checking lubrication points
According to schedule
13
Checking technical condition of wheels
•
14
Adjustment of working pressure of clutch
See 5.2.14
15
Checking chain tightness of front chain
transmission (I stage)
See 5.2.15
16
Checking chain tightness of front chain
transmission (II stage)
See 5.2.16
17
Checking chain tightness of rear chain
transmission
See 5.2.17
18
Change oil in gear wheel transmission
After the first 50 hours of work
and then every 500 hours
19
Change oil in conveyor intersecting axis
gearing
After the first 50 hours of work
and then every 500 hours
Summary of Contents for T743
Page 2: ......
Page 6: ......
Page 11: ......
Page 12: ...SECTION 1 BASIC INFORMATION ...
Page 25: ...Pronar T743 SECTION 1 1 14 ...
Page 26: ...SECTION 2 SAFETY ADVICE ...
Page 46: ...SECTION 2 Pronar T743 2 21 FIGURE 2 3 Locations of information and warning decals ...
Page 47: ...Pronar T743 SECTION 2 2 22 ...
Page 48: ...SECTION 3 DESIGN AND OPERATION ...
Page 80: ...SECTION 4 CORRECT USE ...
Page 99: ...Pronar T743 SECTION 4 4 20 ...
Page 100: ...SECTION 5 MAINTENANCE ...
Page 119: ...Pronar T743 SECTION 5 5 20 FIGURE 5 6 Trailer lubrication points chassis ...
Page 120: ...SECTION 5 Pronar T743 5 21 FIGURE 5 7 Trailer lubrication points vertical conveyor ...
Page 147: ...Pronar T743 SECTION 5 5 48 ...
Page 148: ...NOTES ...
Page 149: ... ...