
66
5.
Rotate the belt so the belt lacing is facing the rear of the mixer.
6.
Cut the lacing of the existing belt on the bottom laces, leaving the top lacing complete. Remove the old lacing
bar and separate the top and bottom lacing.
7.
Attach the new belt to the old belt lacing.
8.
Using the belt hydraulics to install the belt, engage the drive in the reverse direction to feed the belt into the
mixer.
9.
Keep feeding the belt into the mixer until the ends of the belt are even, one above the other on the rear of the
mixer.
10.
Remove the old belt from the new and continue the installation of the new belt from step 11 in the “7.1 BELT
INSTALLATION” procedure.
7.4 LOOSEN THE CHAIN TENSIONER
1.
Loosen the nut on the threaded shaft next to the bearing to allow the shaft to rotate.
Figure 53. Loosen bearing nut.
2.
Loosen the nut on the threaded shaft next to the spring until the nut touches the bearing.
Figure 54. Loosen spring nut.
3.
Loosen the nut on the drive end of the threaded rod until the nut makes contact with the bearing guide.
Summary of Contents for P Series
Page 1: ...1 PROALL Mobile Mixer Service Manual P Model MX04703 August 2020 Rev 1 0 ...
Page 20: ...20 has been removed and not replaced then the charge pressure will drop to zero C ...
Page 85: ...International Manufacturing Inc P P1 OUT IN OUT IN 2 1 3 IN S1 S2 2 1 3 OUT IN ...
Page 100: ... ADMIX 1 ADMIX 2 WORK LIGHTS ...
Page 101: ... COOLER 1 VIB1 SPARE VIB1A SPARE VIB2A VIB2 VIB3 VIB4 VIB5 ...
Page 105: ... BATTERY V BATTERY V ...