
61
Figure 39. Example spindle used while unwinding the belt.
6.
Protect the frame below the belt as the belt unwinds from the spindle. The belt will fall and can catch on the
frame.
Figure 40. Guard shown below the belt to protect the mixer frame from the belt.
7.
Using the belt hydraulics to install the belt, engage the drive in the reverse direction to feed the belt into the
mixer.
8.
When the belt appears at the front of the mixer, remove the bolts holding the links above the belt.
Figure 41. Remove bolts holding the chain links at this stage of the procedure.
9.
Wrap the belt around the belt sprockets and feed the belt back into the mixer, pushing the belt periodically as
the belt is belt hydraulics pushes the belt into the mixer body.
Summary of Contents for P Series
Page 1: ...1 PROALL Mobile Mixer Service Manual P Model MX04703 August 2020 Rev 1 0 ...
Page 20: ...20 has been removed and not replaced then the charge pressure will drop to zero C ...
Page 85: ...International Manufacturing Inc P P1 OUT IN OUT IN 2 1 3 IN S1 S2 2 1 3 OUT IN ...
Page 100: ... ADMIX 1 ADMIX 2 WORK LIGHTS ...
Page 101: ... COOLER 1 VIB1 SPARE VIB1A SPARE VIB2A VIB2 VIB3 VIB4 VIB5 ...
Page 105: ... BATTERY V BATTERY V ...