63
Figure 45. Chain properly resting on upper chain guide.
Figure 46. Chain properly resting on lower chain guide.
13.
Install the coupling link on both sides of the belt lacing, including the link plates and cotter pins.
Figure 47. Install coupling links next to belt lacing.
14.
Using a ratchet strap, place the strap around the ends of the belt and attach the strap to the bin body such as
the last gusset on the aggregate bin. Ensure the strap is offset from the edge of the belt by about 4 inches.
Summary of Contents for P Series
Page 1: ...1 PROALL Mobile Mixer Service Manual P Model MX04703 August 2020 Rev 1 0 ...
Page 20: ...20 has been removed and not replaced then the charge pressure will drop to zero C ...
Page 85: ...International Manufacturing Inc P P1 OUT IN OUT IN 2 1 3 IN S1 S2 2 1 3 OUT IN ...
Page 100: ... ADMIX 1 ADMIX 2 WORK LIGHTS ...
Page 101: ... COOLER 1 VIB1 SPARE VIB1A SPARE VIB2A VIB2 VIB3 VIB4 VIB5 ...
Page 105: ... BATTERY V BATTERY V ...