47
Figure 10. Grease surfaces of idler shaft disk
3.
Place the flat surface of the idler shaft disk on the surface of the wear plate.
4.
Place the rubber inner seal (PN AGSL001D) over the idler shaft.
5.
Place the inner cover plate (PN REJ591) over the inner seal.
6.
Place the retaining ring (PN REJ315) over the inner cover plate. Align the bolt holes through all seal parts and
using two bolts, one on either side of the idler shaft, align the stack together.
Figure 11. Use two bolts to align seal assembly
7.
From the inside of the mix auger frame, orient the seal assembly so the slotted hole in the wear plate is towards
the upper side of the mix auger and aligns with the grease hole in the bottom of the mix auger frame. Install the
seal assembly using the two bolts for alignment of the seal assembly and to secure the seal assembly in place
while installing the remaining bolts.
Summary of Contents for P Series
Page 1: ...1 PROALL Mobile Mixer Service Manual P Model MX04703 August 2020 Rev 1 0 ...
Page 20: ...20 has been removed and not replaced then the charge pressure will drop to zero C ...
Page 85: ...International Manufacturing Inc P P1 OUT IN OUT IN 2 1 3 IN S1 S2 2 1 3 OUT IN ...
Page 100: ... ADMIX 1 ADMIX 2 WORK LIGHTS ...
Page 101: ... COOLER 1 VIB1 SPARE VIB1A SPARE VIB2A VIB2 VIB3 VIB4 VIB5 ...
Page 105: ... BATTERY V BATTERY V ...