
68
2.
Tighten the tension adjust nut against the spring until there is approximately ¼ inch or 6mm of space between
the spring tube and the washer when the tube is held against the bearing guide.
Figure 58. Adjust spring nut.
3.
Secure the threaded rod to the bearing by tightening the nut in the bearing against the lock washer on the
threaded rod.
Figure 59. Secure bearing nut.
Summary of Contents for P Series
Page 1: ...1 PROALL Mobile Mixer Service Manual P Model MX04703 August 2020 Rev 1 0 ...
Page 20: ...20 has been removed and not replaced then the charge pressure will drop to zero C ...
Page 85: ...International Manufacturing Inc P P1 OUT IN OUT IN 2 1 3 IN S1 S2 2 1 3 OUT IN ...
Page 100: ... ADMIX 1 ADMIX 2 WORK LIGHTS ...
Page 101: ... COOLER 1 VIB1 SPARE VIB1A SPARE VIB2A VIB2 VIB3 VIB4 VIB5 ...
Page 105: ... BATTERY V BATTERY V ...