9926813 R04 - 2013-2016
RZR
570 Service Manual
© Copyright Polaris Industries Inc.
7.13
5.
Install
the
upper
pinch
bolt
and
torque
to
specification.
TORQUE
Ball Joint Pinch Bolts:
23 ft-lb (31 Nm)
6.
Apply grease to drive shaft axle splines.
7.
Install front wheel hub assembly, cone washers, and
hand tighten the castle nut. Install washers with
domed side out.
8.
Torque wheel hub nut to specification and install a
new
cotter pin. Tighten nut slightly if necessary to
align cotter pin holes.
TORQUE
Front Wheel Hub Castle Nut:
80 ft-lb (108 Nm)
9.
Install brake caliper mounting bolts and torque to
specification.
TORQUE
Front Caliper Mounting Bolts:
30 ft-lbs (41 Nm)
CAUTION
New bolts have a pre-applied locking agent which is
destroyed upon removal. Always use new brake caliper
mounting bolts upon assembly.
10. Install wheel and four wheel nuts. Torque wheel nuts
to specification.
TORQUE
Wheel Nuts:
Steel Rims: 27 ft-lbs (37 Nm)
Aluminum Rims: 30 ft-lbs (41 Nm) + 90°
11. Rotate wheel and check for smooth operation. Bend
both ends of cotter pin around end of spindle in
different directions.