iNS/iDS 2-Wire System Manual
350-077
Rev. D - 1/20/2021
Page 70 of 107
10.8
Assigning iNS2 PBSs to Phases
Following the Channel Setup process, each connected iNS2 PBS must be named and be assigned a phase. At this point,
all buttons need to have been installed and powered. Click the Phase Setup menu item. It is suggested to name the PBS
with something that identifies the installed location and the phase (must be 4 to 15 characters). If unsure of the location of
a PBS, click Flash button to cause the PBS’ red LED to flash briefly. Assign the appropriate Phase by tapping the down
arrow on the right and selecting the phase in which to assign the PBS. When finished naming all buttons and assigning
phases, click the Save Changes button on the bottom-right of the window.
After these steps, the system should be fully operational. The steps leading up to this point must have been
completed without error to ensure that the PBS walk indications are matched to the correct crosswalks. Walk the
intersection and verify that each PBS is linked to the correct phase. At this point, any desired operating features
may be configured.