8.10.2 - CALIBRATION PROCEDURE FOR PRESSURE SWITCHES MOD. 100
11
13
17
15
10
16
Fig. 8.39.
Calibration of pressure switches mod. 100
SPRING CALIBRATION FOR MAXIMUM PRESSURE TRIP
Step
Action
1
Increase the downstream pressure to the slam-shut valve's cut-out value by turning the main regulator's pilot
adjustment screw to check that the setting is correct.
NOTICE!
Check the pressure referring to the pressure gauge (fig. 8.32, ref. 5) downstream of the main
regulator.
If the slam-shut valve:
•
trips before the expected pressure value: screw in (clockwise) the adjustment ring nut (13)
so as to further compress the spring (11);
•
does not trip at the expected pressure value: unscrew (anti-clockwise) the adjustment ring
nut (13) so as to relieve the spring (11).
2
Reduce the pressure in the downstream section by opening the drain cock (fig. 8.32, ref. 6) to bring it up to
the calibration value of the main regulator.
3
Close the drain cock (fig. 8.32, ref. 6).
4
Reset the slam-shut device by adjusting the reset lever (16).
5
Repeat steps 2-3-4 at least three times.
NOTICE!
The calibration value must comply with the operating limits specified on the plate.