![Perkin-Elmer RamanStation 400 Series Getting Started Manual Download Page 87](http://html1.mh-extra.com/html/perkin-elmer/ramanstation-400-series/ramanstation-400-series_getting-started-manual_1530158087.webp)
Using the RamanStation 400 . 87
13.
Remove the intensity correction standard and store safely.
Any data acquired will now be intensity corrected.
In the unlikely event that the intensity calibration routine should fail, please ensure the NIST
sample is correctly positioned, and that the laser key switch is set to on (armed), and the
laser power is 100%.
Summary
•
The only calibration procedure that needs to be performed on a regular basis is the
wavelength calibration verification procedure.
•
The wavelength and laser frequency calibrations should only be performed if the
instrument fails the wavelength calibration verification procedure.
•
We recommend that the intensity calibration is performed on a yearly basis, unless the
environment (temperature and/or humidity) changes significantly, or the instrument is
moved or repaired.
Summary of Contents for RamanStation 400 Series
Page 1: ...RamanStation 400 Series Getting Started Guide MOLECULAR SPECTROSCOPY ...
Page 5: ...Introduction ...
Page 10: ...10 RamanStation 400 Series Getting Started Guide ...
Page 11: ...Safety Practices ...
Page 27: ...Raman History Theory and Instrumentation ...
Page 34: ...34 RamanStation 400 Series Getting Started Guide ...
Page 35: ...Preparing Your Facility ...
Page 39: ...Installing Your RamanStation 400 Series ...
Page 52: ...52 RamanStation 400 Series Getting Started Guide ...
Page 53: ...Introduction to the RamanStation 400 Series ...
Page 59: ...Fiber Optic Probe ...
Page 66: ...66 RamanStation 400 Series Getting Started Guide ...
Page 67: ...Using the RamanStation 400 ...