86 . RamanStation 400 Series Getting Started Guide
To calibrate using the sample compartment:
1.
Ensure the RamanStation 400 is switched on.
If not, follow SOP-1.
2.
Select
Raman Instrument
from the Setup menu.
The Setup Instrument tabs are displayed.
3.
Select the Setup Instrument Basic tab and ensure that the
Sample Area XYZ Stage
or
Sample Area
is selected as the Accessory.
4.
Ensure that the lens snout is vertical, and that the Snout Orientation is set to
Vertical
in
the software.
5.
Load the NIST sample into a suitable sample holder (with the dull surface facing up).
6.
Select the appropriate
Sample Holder
in the drop down list and load the sample holder
onto the sample stage, following the instructions on-screen if you have a motorized
stage.
7.
Ensure that the RamanStation 400 Series sample compartment is closed and, if you
have a RamanStation 400F, ensure that any external accessory is capped or covered, to
prevent stray light interfering with the measurement.
If you have a RamanMicro 300 Accessory connected to your RamanStation 400F, ensure
that the microscope illumination is switched off.
8.
Select the Setup Instrument Advanced tab and ensure that the laser power is set to
100%.
9.
Focus on the NIST standard.
If you have a motorized stage, click
Raman AutoFocus
on the Setup Sample Area
XYZ Stage tab to focus using the strongest Raman signal. The Focus Limits should be
set to
Full Range
.
10.
Select the Setup Instrument Advanced tab and click
Toolbox
.
The Adjustments Toolbox dialog is displayed.
11.
Select
.
The Intensity Calibration dialog is displayed.
12.
Ensure that you have followed the instructions on the dialog, and then click
Next
.
The instrument will now perform the intensity calibration routine. When the calibration
is completed, the results are displayed.
Summary of Contents for RamanStation 400 Series
Page 1: ...RamanStation 400 Series Getting Started Guide MOLECULAR SPECTROSCOPY ...
Page 5: ...Introduction ...
Page 10: ...10 RamanStation 400 Series Getting Started Guide ...
Page 11: ...Safety Practices ...
Page 27: ...Raman History Theory and Instrumentation ...
Page 34: ...34 RamanStation 400 Series Getting Started Guide ...
Page 35: ...Preparing Your Facility ...
Page 39: ...Installing Your RamanStation 400 Series ...
Page 52: ...52 RamanStation 400 Series Getting Started Guide ...
Page 53: ...Introduction to the RamanStation 400 Series ...
Page 59: ...Fiber Optic Probe ...
Page 66: ...66 RamanStation 400 Series Getting Started Guide ...
Page 67: ...Using the RamanStation 400 ...