287
JAN 2006
Ver. 5.2
DP-3510/3520/3530/4510/4520/4530/6010/6020/6030
(10) Pullout and remove the
OPC Shipping Metal
Bracket
to unlock the
OPC Drum
.
(11) Store the
OPC Shipping Metal Bracket
removed in step (10) into the 2nd Paper Tray as
illustrated.
(12) Remove 1
Screw
.
(13) Remove the
Developer Harness Cover
(Clear)
and disconnect the
Harness
.
(14) Turn the
Release Lever
Clockwise (90
°
).
(15) Remove the
Developer Unit
.
(16) Release 3 Latch Hooks and remove the
Upper
Developer Cover
.
(17) Shake the bottle of developer thoroughly
(approx. 30 seconds).
(18) Pour the appropriate developer evenly into the
developer unit. Make sure to empty the bottle.
(19) Reinstall the
Upper Developer Cover
.
Note:
When reinstalling, ensure that 3 Latch Hooks are
hooked correctly.
(20) Reinstall the
Developer Unit
.
(21) Reconnect the Harness, reinstall the Developer
Harness Cover and turn the Release Lever
counter-clockwise.
(10)
(11)
(12)
(13)
(15)
(14)
(16)
Summary of Contents for Workio DP-3510
Page 4: ...4 Beispiel DP 6530 4530 6030 Hinweis...
Page 424: ...424 JAN 2006 Ver 5 2 DP 3510 3520 3530 4510 4520 4530 6010 6020 6030...
Page 425: ...425 JAN 2006 Ver 5 2 DP 3510 3520 3530 4510 4520 4530 6010 6020 6030...
Page 474: ...474 JAN 2006 Ver 5 2 DP 3510 3520 3530 4510 4520 4530 6010 6020 6030 memo...
Page 842: ...memo...
Page 858: ...DZZSM00298...