403
JAN 2006
Ver. 5.2
DP-3510/3520/3530/4510/4520/4530/6010/6020/6030
8.31. Installing the Punch Unit (DA-SP41)
8.31.1. Contents
Note:
1. The part number may differ depending on the Destination.
2. Refer to the Parts List in the Parts Manual.
8.31.2. Installation
CAUTION!
Turn the Power Switch on the Left Side and the Main Power Switch on the Back of the
machine to the OFF position, and then unplug the AC Power Cord before beginning
installation.
Qty.
Description
Part No.
Remarks
1
Punch Unit
See Note
1
Punch Relay Harness (Orange)
YA1020K374B
1
Punch Relay Harness (Violet)
YA1020K375A
1
Jam Removal Label
YA1020P828A
1
Punch Dust Label
YA1020P208A
1
Screw (M4 x 6)
See Note
1
Installation Instructions
DZSM000572
This document
1. Removing the Packing Material
Note:
This machine is protected with packing material
such as tape and spacers against vibration and
shocks caused during transportation. Be sure to
remove them before using the machine.
(1) Take the Punch Unit and accessories out of the
package.
(2) Remove the tape securing the Covers and Front
Door.
2. Making Preparations for Installing the Finisher
Side
(1) Turn off the Host Machine and disconnect the
Interface Cable of the Finisher from the Host
Machine.
(2) Release the Latch of the Finisher, and move the
Finisher outward from the host machine.
(3) Open the Front Door. Holding the tab with your
fingers, remove the Jam Clear Dial.
(4) Remove the 2 Screws.
Screw
Screw
Jam
Release
Dial
Tab
Front Door
Summary of Contents for Workio DP-3510
Page 4: ...4 Beispiel DP 6530 4530 6030 Hinweis...
Page 424: ...424 JAN 2006 Ver 5 2 DP 3510 3520 3530 4510 4520 4530 6010 6020 6030...
Page 425: ...425 JAN 2006 Ver 5 2 DP 3510 3520 3530 4510 4520 4530 6010 6020 6030...
Page 474: ...474 JAN 2006 Ver 5 2 DP 3510 3520 3530 4510 4520 4530 6010 6020 6030 memo...
Page 842: ...memo...
Page 858: ...DZZSM00298...