44 |
orbitalum tools
GmbH, D-78224 Singen, www.orbitalum.com, Tel. +49 (0) 77 31 792-0
(01.2012) OM_BA_ORBIMAT_CA_01_EN
OPERATION
ORBIMAT CA
| Operating instructions
8.4
Saving and calling up a procedure
8.4.1
Saving a procedure
Procedure status
With an unsaved procedure, "[unsaved]" appears next to the name of the procedure in the "Procedure name" field in the
display. The procedures are saved in folders. The folders can be created and named as desired. The "Default" folder is
specified and cannot be deleted.
X
Recommendation
: Save procedures regularly, including after adjusting individual parameters.
Deactivating the folder structure
1. In the main menu, select "System settings" > "System adjustments".
2. Select the "No" option for "Create new folders".
The folder structure is deactivated. All procedures are saved in the main directory.
Saving a procedure under existing name
The name of the folder in which the procedure is saved appears in the "Folder" field in the display.
1. Press softkey 3 ("Save").
A prompt appears.
2. Confirm the prompt with "Yes".
3. The procedure is saved with the adjustments.
Saving an adjusted procedure under new name
1. Press the "Save" button in the main menu.
2. Press "New folder" button or select an existing folder.
If "New folder" was pressed:
Z
Select input field and briefly press the rotary knob.
Z
The input field is activated (red).
Z
Enter folder name with the keyboard.
Z
Press "OK" button.
The new folder is created.
Z
Select new folder.
3. Highlight and activate input field for procedure name and enter new procedure name.
4. Press "OK" button.
The program is saved with the new name (possibly in newly created folder).
8.4.2
Calling up a procedure
X
Recommendation
: Save unsaved procedures if necessary before calling up a procedure.
1. Press the "Select procedure" button in the main menu.
2. Select folder.
A list of procedures appears. Additional information on each procedure appears in the display.
3. Select procedure.
If an unsaved procedure is loaded in the RAM, another procedure cannot be loaded.
A warning appears:
"Cancel": The procedure call is interrupted. The main menu appears:
"No": The unsaved procedure is not saved, and any adjustments made are lost.
The selected procedure is called up.
"Yes": The unsaved procedure is saved. The main menu appears.
If unsaved procedures are saved or adjustments were rejected:
4. Call up procedure again.
The selected program appears in the display.
Summary of Contents for ORBIMAT 165 CA
Page 78: ...orbitalum tools gmbh Notizen Notes ...
Page 79: ......