Route the Power Cords and Management Cables
Related Information
■
“Stabilize the Rack” on page 29
■
■
“Install the Rackmount Hardware” on page 32
■
“Route the Power Cords and Management Cables” on page 38
■
“Install the Switch” on page 39
■
“Install an I/O Module” on page 42
■
“Remove a Filler Panel” on page 47
Route the Power Cords and Management Cables
The facility power receptacles for the power cords should be located such that the power cords
are routed out of the way.
1.
Identify the prerequisite and subsequent installation tasks that you must
perform in conjunction with this task.
See
“Installation Task Overview” on page 11
2.
Route the female end of the power cords up from the power distribution panel or
receptacles at the rear of the rack.
3.
Route the network management cable and serial management cable (if a full-time
serial management cable will be used) from their respective hubs, concentrators,
or switches, to the rack.
4.
Route the cords and management cables to the left rear side where you are
installing the switch.
5.
Add at least 8 inches of slack to the cable lengths to enable connection and
disconnection with the switch power receptacles, the SER MGT connector, the
PrizmMT connectors, and the RJ-45 connectors.
6.
Secure the cables to the rack mounting location with this additional slack.
Use hook and loop fastener straps to bundle and secure the cables.
7.
Install the switch.
See
“Install the Switch” on page 39
.
Related Information
■
“Stabilize the Rack” on page 29
■
■
“Install the Rackmount Hardware” on page 32
38
Oracle Fabric Interconnect F2-12 Installation Guide • November 2016
Summary of Contents for Fabric Interconnect F2-12
Page 1: ...Oracle Fabric Interconnect F2 12 Installation Guide Part No E74400 01 November 2016...
Page 2: ......
Page 8: ...8 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Page 10: ...10 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Page 22: ...22 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Page 88: ...88 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Page 118: ...118 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...