Remove a Filler Panel
b.
Use the release lever to pull the filler panel from the switch chassis.
c.
Use your free hand to take the weight of the filler panel, as it comes free of
the chassis.
d.
Set the filler panel aside.
3.
Finish installing an I/O module.
“Install an I/O Module” on page 42
Installing the Switch
49
Summary of Contents for Fabric Interconnect F2-12
Page 1: ...Oracle Fabric Interconnect F2 12 Installation Guide Part No E74400 01 November 2016...
Page 2: ......
Page 8: ...8 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Page 10: ...10 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Page 22: ...22 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Page 88: ...88 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Page 118: ...118 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...